|
|
|
|
||||| |
 |
 |
|
|
Jack-up platform ODIN – for repair and construction works of hydro technical buildings and equipment. |
|
|
client: |
Hochtief Constructions, AG Germany. |
|
|
length (m): width (m): weight (t): |
46.10 30.00 2200 |
begining: completion: |
2003-12-18 2004-10-26 |
| |
|
Live fish transportation ship "SEIGRUNN" |
|
|
client: |
Karmsund Maritime Srvice AS, Norway. |
|
|
length (m): width (m): weight (t): |
49.90 11.60 500 |
begining: completion: |
2002-07-25 2003-01-02 |
|
The superstructure was made from aluminum (10 t). It is the second largest transport ship of such type. Two special tanks are installed there (total capacity 1200 m3), piping installed, foundations for propulsion and auxiliary engines and pumps, steering mechanism. Above-water part of the ship, the deck, interior premises, partitions are metalized – the total area of 1790 m2 was covered with zinc and the hull was painted fully. |
|
Hull building for oil platform service ship |
|
|
client: |
Sira Offshore AS, Norway. |
|
|
length (m): width (m): weight (t): |
73.40 16.60 1370 |
begining: completion: |
2002-03-14 2003-04-07 |
| |
|
|
|
|
|
|
|
|
|
|
Western Shipyard: Designing, construction and ships repair
|
Solution: ProfIS
|
|
|